Hawk Cove:Ord 100-11 Fee Schedule: Difference between revisions
code>Jerry A. Goodson |
m 1 revision imported |
(No difference)
| |
Latest revision as of 21:12, 13 October 2026
ORDINANCE NO. 100-11 FEE SCHEDULE
CITY OF HAWK COVE - PERMITS / FEES
(As Authorized by City Ordinance 100-11)
(Revision 7 - 03/21/2023)
- (1) BUILDING/ INSTALLATION PERMITS - RESIDENTIAL:
- (Specific minimum / maximum size or setback compliance related to a particular lot determined by Chief Building Official after review of survey, plans & specifications)
- New, prefab, or existing addition:
- 450 sf (minimum) 999sf (with lot waiver) … $250
- 1000 (Ordinance minimum) - 1599 sf …$350
- 1600-2000 sf … $450
- Over 2001 sf … $500
- (2) Move in/out Oversize Load Permit [Escort Fee] PER UNIT MOVED For city costs related to escort and traffic control until off city streets. This includes Manufactured, Modular, relocated Site-built homes, garages, shop/storage buildings or any structure exceeding 8' wide or 20' long. … $100
Any mobile or manufactured home built before June 15, 1976, or not having a HUD or Modular tag affixed or verifiable, is ineligible for move-in/ installation.
- All move-in homes built after 1976 or prior to 2012 must be upgraded to 2012 International building, safety and condition standards; with Final Inspection / Certificate of Occupancy required before property can be occupied. (A 30-day temporary CO may be issued for minor items at the discretion of Chief Building Official).
- Existing units having any of the above age, structural, condition or certification deficiencies, (or Ordinance violations not feasible / practical to remedy) cannot be re-occupied when vacated and must be demolished or removed
- (Grandfather clauses for structures or improvements expire when property vacant over 30 days, sold or ownership transferred).
- Property survey required before any property can be moved in or constructed.
- All primary living units - (minimum and/or maximum square footage due to lot size same as new construction requirements in #1 above).
- All Zoning, Building and Condition Code requirements apply. Wheels, axles and towing tongues must be removed, with property placed on acceptable permanent foundation.
- (3) (a) Additions to existing homes (fee based on sq ft of addition, as #4 below) … $75-$300
- (b) Renovation / Remodel - general … $250
- (c) Modifying Structure (Moving / Removing walls/gutting home, substantial burn-out / fire repair, etc) … $400
- (d) Auxiliary Living Unit (Guest House) - 450 sq ft Minimum Same as #1 above … $250-$500
- Auxiliary Living Units cannot have separate address or utility connections; must meet same minimum building standards as primary home / adopted city residential building standards.
- (4) Other Site Improvements - (New Construction or Existing Move-in)
- (a) Storage Buildings or Additions
- 0-100 sf … $0
- 101-200 sf … $75
- 201-300 sf … $150
- (over 300 sf considered garage or shop)
- (b) Garages / Shops or Additions
- 301-500 sf … $200
- 501-700 sf … $300
- Over 700 sf … $400
- (c) Enlarge existing outbuildings: (based on sq ft added, per (a) or (b) above … $75-$400
- (d) Carports
- 1 Car (200-250 sf) … $75
- 2 Car (400-450 sf) … $100
- 3 Car (600-650 sf) … $200
- 4+ … Quote
- Lean-to covers or attached storage units added + $75
- (e) Deck/Porch/Gazebo
- 0-100 sf … $50
- 101-300 sf … $100
- 301-500 sf … $150
- (f) Fences: (Cyclone or Privacy) … $75
- (g1) In Ground Pool (State Mandated fencing regulations apply) … $200
- (g2) Seasonal soft sided/ inflatable pools less than 2' deep at maximum fill level … $0
- (g3) Hard Sided, Inflatable or Tube Frame & liner, pools, 3'or greater depth at maximum fill level. $100
- 1. Lot must have continuous lot perimeter fencing with locking gates.
- 2. Pool empty or covered and access ladder removed when not in use.
- (h) Demolition Permit:
- Residential … $100
- Storage / Outbuilding - 100 sf or larger … $25
- (a) Storage Buildings or Additions
- (5a) Plumbing - Contractor permit … $75
- (5b) Electric - Contractor permit … $75
- (5c) Mechanical/AC/Heat permit … $75
- (5d) Temp Electric Pole permit without or during construction … $25
- (6a) Sewer Tap (Service Availability) Fee … $1000
- *Does not include amount plumber charges for Tap work or laying line to house.
- (6b) NEW SERVICE SEWER DEPOSIT (3 months) … $363
- (6c) Sewer Connection Fee /Account set-up Admin Fee (to existing tap) … $45
- (7) Culvert Installation - (if installed by city) … $300-$400
- NO FEE IF OWNER INSTALLED
- Owner must provide culvert, Minimum 15" diameter x 20' length.
- Culverts are required for all driveway entrances.
- (8) Disability Ramp Permit/ Builder Certification of construction requirements. … $0
- Must be new treated lumber / Plans to be submitted prior to construction.
- (9) Certificate of Occupancy - (Inspection required each time property is occupied) … $75
- (10) Rental Property - Annual Permit … $100
- (Subject to inspection for CO and sewer account established each vacancy)
- (11) Building Permit Fees - Commercial
- 1000-1400 sf … $350
- Over 1400 sf … $500
- Plans must be submitted and approved prior to permit issuance.
- (12) Additions to Existing Building – Commercial … $250
- Plans, Specs and/or location sketch for all construction permits must be submitted for approval.
- Substantial projects, new construction or move-ins may be subject to administrative review fee or submitted to Engineering/Inspection service.
- (13) Plan reviews, interim building construction inspections and C.O's may be required to be done by BUREAU VERITAS AT 837-8775 ОR FAXED TO (877) 837-8859. Requests can also be emailed to: inspectionstx@us.bureauveritas.com.
- The building final inspection must be passed prior to occupancy of building.
Misc. Permits / Fees:
- (a) Garage/ Yard Sale (4/year maximum) … $5
- (b1) Commercial Door to Door, Street Vendor, Donor or Solicitor permit (annual) … $100
- (b2) Non-Commercial individual or group registration / permit … $0 **
- ** Permits are for identity and contact information of vendor or groups, to protect citizens and/or city in the event of any related complaints or problems.
- Fee waiver for valid charitable organizations, youth groups, civic or political rallies, parades, or vendors performing legitimate similar functions.
- (c) Commercial or large group Special Use Permits … $100 min
- (d) Notary Public Charges … $5
- (e) NSF check charge … $35
- (f) Admin Fee on Abatements … $50
- (g) 911 number research fee … $20
- (*)' 'Private Kennel or Multi-pet Premise permit, as defined by Ordinance 06-110-1
- (*) Private Kennel Permit: … $200 fee - 1st year, $100 each consecutive year.
- (*) Multi-Pet Premise: … $100 fee - 1st year, $20 each consecutive year.
If activity requiring permit has begun or completed without permit, a 50% or $50 penalty fee (whichever is higher) will be assessed. Unpaid permit, penalty or collection fees may result in a lien on property and citations issued.
Plans, Specs and/or location sketch for all construction permits must be submitted for approval. Substantial projects, new construction or move-ins may be subject to administrative review fee of $50.00.
CONCLUSION
PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF HAWK COVE, TEXAS, ON THIS 31st DAY OF MARCH, 2023.