ORDINANCE NO. 100-11 FEE SCHEDULE

CITY OF HAWK COVE - PERMITS / FEES

(As Authorized by City Ordinance 100-11)

(Revision 7 - 03/21/2023)

(1) BUILDING/ INSTALLATION PERMITS - RESIDENTIAL:
(Specific minimum / maximum size or setback compliance related to a particular lot determined by Chief Building Official after review of survey, plans & specifications)
New, prefab, or existing addition:
450 sf (minimum) 999sf (with lot waiver) … $250
1000 (Ordinance minimum) - 1599 sf …$350
1600-2000 sf … $450
Over 2001 sf … $500
(2) Move in/out Oversize Load Permit [Escort Fee] PER UNIT MOVED For city costs related to escort and traffic control until off city streets. This includes Manufactured, Modular, relocated Site-built homes, garages, shop/storage buildings or any structure exceeding 8' wide or 20' long. … $100

Any mobile or manufactured home built before June 15, 1976, or not having a HUD or Modular tag affixed or verifiable, is ineligible for move-in/ installation.

All move-in homes built after 1976 or prior to 2012 must be upgraded to 2012 International building, safety and condition standards; with Final Inspection / Certificate of Occupancy required before property can be occupied. (A 30-day temporary CO may be issued for minor items at the discretion of Chief Building Official).
Existing units having any of the above age, structural, condition or certification deficiencies, (or Ordinance violations not feasible / practical to remedy) cannot be re-occupied when vacated and must be demolished or removed
(Grandfather clauses for structures or improvements expire when property vacant over 30 days, sold or ownership transferred).
Property survey required before any property can be moved in or constructed.
All primary living units - (minimum and/or maximum square footage due to lot size same as new construction requirements in #1 above).
All Zoning, Building and Condition Code requirements apply. Wheels, axles and towing tongues must be removed, with property placed on acceptable permanent foundation.
(3) (a) Additions to existing homes (fee based on sq ft of addition, as #4 below) … $75-$300
(b) Renovation / Remodel - general … $250
(c) Modifying Structure (Moving / Removing walls/gutting home, substantial burn-out / fire repair, etc) … $400
(d) Auxiliary Living Unit (Guest House) - 450 sq ft Minimum Same as #1 above … $250-$500
Auxiliary Living Units cannot have separate address or utility connections; must meet same minimum building standards as primary home / adopted city residential building standards.
(4) Other Site Improvements - (New Construction or Existing Move-in)
(a) Storage Buildings or Additions
0-100 sf … $0
101-200 sf … $75
201-300 sf … $150
(over 300 sf considered garage or shop)
(b) Garages / Shops or Additions
301-500 sf … $200
501-700 sf … $300
Over 700 sf … $400
(c) Enlarge existing outbuildings: (based on sq ft added, per (a) or (b) above … $75-$400
(d) Carports
1 Car (200-250 sf) … $75
2 Car (400-450 sf) … $100
3 Car (600-650 sf) … $200
4+ … Quote
Lean-to covers or attached storage units added + $75
(e) Deck/Porch/Gazebo
0-100 sf … $50
101-300 sf … $100
301-500 sf … $150
(f) Fences: (Cyclone or Privacy) … $75
(g1) In Ground Pool (State Mandated fencing regulations apply) … $200
(g2) Seasonal soft sided/ inflatable pools less than 2' deep at maximum fill level … $0
(g3) Hard Sided, Inflatable or Tube Frame & liner, pools, 3'or greater depth at maximum fill level. $100
1. Lot must have continuous lot perimeter fencing with locking gates.
2. Pool empty or covered and access ladder removed when not in use.
(h) Demolition Permit:
Residential … $100
Storage / Outbuilding - 100 sf or larger … $25
(5a) Plumbing - Contractor permit … $75
(5b) Electric - Contractor permit … $75
(5c) Mechanical/AC/Heat permit … $75
(5d) Temp Electric Pole permit without or during construction … $25
(6a) Sewer Tap (Service Availability) Fee … $1000
*Does not include amount plumber charges for Tap work or laying line to house.
(6b) NEW SERVICE SEWER DEPOSIT (3 months) … $363
(6c) Sewer Connection Fee /Account set-up Admin Fee (to existing tap) … $45
(7) Culvert Installation - (if installed by city) … $300-$400
NO FEE IF OWNER INSTALLED
Owner must provide culvert, Minimum 15" diameter x 20' length.
Culverts are required for all driveway entrances.
(8) Disability Ramp Permit/ Builder Certification of construction requirements. … $0
Must be new treated lumber / Plans to be submitted prior to construction.
(9) Certificate of Occupancy - (Inspection required each time property is occupied) … $75
(10) Rental Property - Annual Permit … $100
(Subject to inspection for CO and sewer account established each vacancy)
(11) Building Permit Fees - Commercial
1000-1400 sf … $350
Over 1400 sf … $500
Plans must be submitted and approved prior to permit issuance.
(12) Additions to Existing Building – Commercial … $250
Plans, Specs and/or location sketch for all construction permits must be submitted for approval.
Substantial projects, new construction or move-ins may be subject to administrative review fee or submitted to Engineering/Inspection service.
(13) Plan reviews, interim building construction inspections and C.O's may be required to be done by BUREAU VERITAS AT 837-8775 ОR FAXED TO (877) 837-8859. Requests can also be emailed to: inspectionstx@us.bureauveritas.com.
The building final inspection must be passed prior to occupancy of building.

Misc. Permits / Fees:

(a) Garage/ Yard Sale (4/year maximum) … $5
(b1) Commercial Door to Door, Street Vendor, Donor or Solicitor permit (annual) … $100
(b2) Non-Commercial individual or group registration / permit … $0 **
** Permits are for identity and contact information of vendor or groups, to protect citizens and/or city in the event of any related complaints or problems.
Fee waiver for valid charitable organizations, youth groups, civic or political rallies, parades, or vendors performing legitimate similar functions.
(c) Commercial or large group Special Use Permits … $100 min
(d) Notary Public Charges … $5
(e) NSF check charge … $35
(f) Admin Fee on Abatements … $50
(g) 911 number research fee … $20
(*)' 'Private Kennel or Multi-pet Premise permit, as defined by Ordinance 06-110-1
(*) Private Kennel Permit: … $200 fee - 1st year, $100 each consecutive year.
(*) Multi-Pet Premise: … $100 fee - 1st year, $20 each consecutive year.

If activity requiring permit has begun or completed without permit, a 50% or $50 penalty fee (whichever is higher) will be assessed. Unpaid permit, penalty or collection fees may result in a lien on property and citations issued.

Plans, Specs and/or location sketch for all construction permits must be submitted for approval. Substantial projects, new construction or move-ins may be subject to administrative review fee of $50.00.

CONCLUSION

PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF HAWK COVE, TEXAS, ON THIS 31st DAY OF MARCH, 2023.